聯(lián)系我們
濟(jì)南富強(qiáng)門業(yè)有限公司
聯(lián)系人:林經(jīng)理
電話:151 6888 2846
郵箱:527800164@qq.com
地址:濟(jì)南市歷下區(qū)化纖廠路8號(hào)3號(hào)樓101號(hào)
生產(chǎn)濟(jì)南卷簾門要把控好質(zhì)量
來(lái)源:http://99feipin.cn 日期:2021-07-01 發(fā)布人:
質(zhì)量對(duì)于所有的行業(yè)的產(chǎn)品來(lái)說(shuō)都是非常重要的,這不僅關(guān)系到產(chǎn)品的使用壽命、使用質(zhì)量,也關(guān)系到產(chǎn)品的銷售,還有產(chǎn)品企業(yè)的聲譽(yù)名氣等等,所以在生產(chǎn)產(chǎn)品的時(shí)候要把控好質(zhì)量問(wèn)題。那么像卷簾門這樣的產(chǎn)品在生產(chǎn)的時(shí)候質(zhì)量要怎么樣控制好呢?下面我們來(lái)聽(tīng)聽(tīng)富強(qiáng)對(duì)卷簾門生產(chǎn)質(zhì)量控制的六個(gè)步驟,希望對(duì)大家會(huì)有所幫助!
Quality is very important for the products of all industries. It is not only related to the service life and quality of products, but also related to the sales of products, as well as the reputation and reputation of product enterprises. Therefore, we should control the quality problems in the production of products. So how to control the quality of products like rolling shutter in production? Now let's listen to the six steps of Fuqiang's quality control of rolling shutter door production, hoping to help you!
濟(jì)南卷簾門
Jinan rolling shutter door
1.卷簾門生產(chǎn)前過(guò)程控制:
1. Process control before rolling door production:
針對(duì)于卷簾門生產(chǎn)的全過(guò)程,包括了技術(shù)洽談,技術(shù)確認(rèn),技術(shù)輸出,采購(gòu)驗(yàn)證,生產(chǎn)加工,過(guò)程檢驗(yàn),安裝報(bào)驗(yàn)等過(guò)程,通過(guò)過(guò)程控制,以保證產(chǎn)品和服務(wù)質(zhì)量。
Aiming at the whole process of rolling door production, including technical negotiation, technical confirmation, technical output, procurement verification, production and processing, process inspection, installation and inspection, through process control, to ensure the quality of products and services.
2.檢驗(yàn)和試驗(yàn):
2. Inspection and test:
為了保證產(chǎn)品卷簾門的質(zhì)量,我們需要采取正確的檢驗(yàn)方法,采用適當(dāng)?shù)臋z驗(yàn)工具,配備合格的檢驗(yàn)人員,對(duì)于原材料,工序,安裝等過(guò)程進(jìn)行檢驗(yàn),為卷簾門的合格提供證據(jù)。
In order to ensure the quality of the rolling shutter door, we need to take the correct inspection methods, use appropriate inspection tools, equipped with qualified inspection personnel, for raw materials, processes, installation and other processes for inspection, to provide evidence for the rolling shutter door.
3.終檢驗(yàn)和試驗(yàn):
3. Final inspection and test:
按照開(kāi)得樂(lè)的產(chǎn)品生產(chǎn)要求,要進(jìn)行終產(chǎn)品的檢驗(yàn),按照客戶的要求,對(duì)于產(chǎn)品的安裝后進(jìn)行報(bào)驗(yàn)。若是通過(guò)終的檢驗(yàn),那么就能夠?yàn)楣こ烫峁┖细竦漠a(chǎn)品。
According to the product production requirements of Caldwell, the final product should be inspected. According to the customer's requirements, the product should be inspected after installation. If it passes the final inspection, then it can provide qualified products for the project.
4.檢驗(yàn)和試驗(yàn)狀態(tài):
4. Inspection and test status:
在對(duì)卷簾門產(chǎn)品進(jìn)行加工的時(shí)候,完成安裝的各個(gè)過(guò)程的時(shí)候要按照規(guī)定采用適當(dāng)?shù)臉?biāo)識(shí),這樣是為了確保合格的產(chǎn)品能夠進(jìn)入到下一道工序。
In the rolling door products processing, the completion of the installation of each process should be in accordance with the provisions of the appropriate identification, so as to ensure that qualified products can enter the next process.
簾門廠家在生產(chǎn)卷簾門的時(shí)候,應(yīng)該注重產(chǎn)品的質(zhì)量,要嚴(yán)格按照的標(biāo)準(zhǔn)去做,才能做出更好的、更符合人們需求的卷簾門。
Curtain door manufacturers in the production of rolling doors, should pay attention to the quality of products, in strict accordance with national standards to do, in order to make better, more in line with people's needs of rolling doors.
閱讀/ Recommended reading
- 電動(dòng)卷簾門的優(yōu)勢(shì) 2024-11-12
- 濟(jì)南卷簾門:卷簾門遙控器失靈怎么辦? 2024-09-02
- 濟(jì)南卷簾門廠:卷簾門卡主了怎么辦 2024-08-28
- 濟(jì)南電動(dòng)卷簾門:電動(dòng)卷閘門沒(méi)電了怎么開(kāi)? 2024-08-28
- 濟(jì)南卷簾門:控制器的安裝技巧 2024-07-06
- 車庫(kù)門出現(xiàn)故障怎么辦? 2024-06-12
- 防火卷簾門分幾種類別? 2024-06-06
- 防火卷簾門對(duì)于企業(yè)的使用有哪些? 2024-06-09
濟(jì)南卷簾門:卷簾門遙控器失靈時(shí)試試本文的方法吧!
2024-11-16
檢查電池 : Check the battery: 檢查遙控器電池是否還有電。如果電池電量不足,更換一節(jié)新的電池即可。在更換電池時(shí),注意電池的正負(fù)極方向,確保放入的電池...