快速卷簾門的安裝必經(jīng)的兩大步驟
一軌道的安裝
Installation of a track
在快速卷簾門的兩側(cè)確定導(dǎo)軌安裝位置,用錘線放出導(dǎo)軌基準(zhǔn)線,放出導(dǎo)軌連接件固定螺栓十字線,導(dǎo)軌超過吊*不小于75cm。
Determine the installation position of the guide rail on both sides of the quick rolling shutter door, use a hammer line to set out the reference line of the guide rail, and set out the cross line of the fixing bolt of the guide rail connection. The guide rail should exceed the hanging height by no less than 75cm.
用沖擊鉆在墻柱上打出連接件固定膨脹螺栓孔,連接件的間距不可以大于600mm,并且,兩端距導(dǎo)軌口100mm。先上下固定幾塊連接件,將其導(dǎo)軌貼上,校正其垂直并點(diǎn)焊,導(dǎo)軌固定后在復(fù)合簾一下導(dǎo)軌的垂直度,每米不得大于5mm,全長(zhǎng)垂直度不得超過20mm,復(fù)合簾面嵌入導(dǎo)軌深度(見GBl4102—2005)。
Use an impact drill to drill the expansion bolt holes for fixing the connectors on the wall column. The spacing between the connectors should not exceed 600mm, and both ends should be 100mm away from the guide rail opening. Firstly, fix several connecting pieces up and down, attach their guide rails, correct their verticality, and spot weld them. After the guide rails are fixed, the verticality of the guide rails below the composite curtain should not exceed 5mm per meter, and the full length verticality should not exceed 20mm. The depth of the composite curtain surface embedded in the guide rails (see GBl4102-2005).
將其余連接件裝上,連接件與導(dǎo)軌之問采用點(diǎn)焊,每件連接件與一導(dǎo)軌間點(diǎn)焊點(diǎn)不少于5點(diǎn),點(diǎn)焊的寬度不小于5mm,焊接處絕不應(yīng)穿現(xiàn)象發(fā)生。采用不銹鋼導(dǎo)軌時(shí)焊條采用不銹鋼焊條。
Install the remaining connecting pieces, and use spot welding between the connecting pieces and the guide rail. There should be no less than 5 spot welding points between each connecting piece and one guide rail, and the width of the spot welding should not be less than 5mm. The welding should never be penetrated. When using stainless steel guide rails, stainless steel welding rods are used.
二快速卷簾門大軸的安裝
Installation of the main shaft of the second fast rolling shutter door
快速卷簾門大軸安裝前,先將掛板定好方向裝到卷軸上,再把4-6片簾板裝到掛板上并卷緊在卷軸上川鐵絲扎牢。
Before installing the main shaft of the fast rolling shutter door, first orient the hanging plate onto the rolling shaft, and then install 4-6 curtain plates onto the hanging plate and tighten them onto the rolling shaft with Sichuan iron wire.
吊裝快速卷簾門大軸,一定要注意。安排指揮人字梯腳手架手拉葫蘆都要經(jīng)過檢查??焖倬砗熼T安裝時(shí)先將套上軸承及座的光軸塞入卷軸端孔中,對(duì)準(zhǔn)位置后將軸承固定螺栓擰緊。
When lifting the large shaft of the fast rolling shutter door, it is necessary to pay attention to safety. The arrangement of command ladder, scaffolding, and chain hoists must be inspected. When installing the fast rolling shutter door, first insert the optical shaft with the bearing and seat into the end hole of the rolling shaft, align it with the position, and then tighten the bearing fixing bolts.
卷軸上好后,可左右移動(dòng)卷筒調(diào)節(jié)位置。同時(shí),用水平尺和水平管復(fù)核一下卷軸的水平。調(diào)整好后,光軸與卷軸滿焊固定,光軸與軸承用支頭螺釘固定。
After the reel is installed, the reel can be moved left and right to adjust its position. At the same time, double check the level of the scroll with a level ruler and a horizontal tube. After adjustment, the optical shaft and the rolling shaft are fully welded and fixed, and the optical shaft and bearing are fixed with support screws.
卷軸吊裝時(shí)要特別注意不要碰壞卷在軸上的簾板,用鋼絲繩捆扎時(shí)要墊木板。
When hoisting the reel, special attention should be paid not to damage the curtain board rolled on the reel, and wooden boards should be used when tying with steel wire ropes.
本文由濟(jì)南卷簾門為您提供,我們的網(wǎng)站是:http://99feipin.cn將以全心全意的熱情為您提供服務(wù),歡迎您的訪問!
This article is provided by Jinan Rolling Shutter Door. Our website is: http://99feipin.cn We will provide you with wholehearted enthusiasm and welcome your visit!
閱讀/ Recommended reading
- 電動(dòng)卷簾門的優(yōu)勢(shì) 2024-11-12
- 濟(jì)南卷簾門:卷簾門遙控器失靈怎么辦? 2024-09-02
- 濟(jì)南卷簾門廠:卷簾門卡主了怎么辦 2024-08-28
- 濟(jì)南電動(dòng)卷簾門:電動(dòng)卷閘門沒電了怎么開? 2024-08-28
- 濟(jì)南卷簾門:控制器的安裝技巧 2024-07-06
- 車庫門出現(xiàn)故障怎么辦? 2024-06-12
- 防火卷簾門分幾種類別? 2024-06-06
- 防火卷簾門對(duì)于企業(yè)的使用有哪些? 2024-06-09
檢查電池 : Check the battery: 檢查遙控器電池是否還有電。如果電池電量不足,更換一節(jié)新的電池即可。在更換電池時(shí),注意電池的正負(fù)極方向,確保放入的電池...